Whole-Home Renovation Across the Houston Metro

A whole-home renovation reworks every room under one scope and one schedule — layout, mechanicals, envelope and finishes together. It is the one chance to fix a house’s bones and its looks in the same pass, in the right order.

  • Written room-by-room scope before demolition
  • Licensed electricians, plumbers and HVAC techs
  • Permit path verified by jurisdiction, not mailing address
  • One trade sequence, one schedule

Scope

What whole-home renovation actually involves

Whole-home cosmetic refresh

Every room gets new surfaces, but nothing moves. Flooring runs continuous through the house, walls and ceilings are repainted, interior doors, trim, lighting and plumbing fixtures are swapped, and cabinetry is replaced in the existing footprint. Fast, largely permit-light, and the right call when the layout already works and the mechanicals still have life left in them.

Gut renovation inside the footprint

Back to studs and slab. Non-structural walls come out, kitchens and baths are relocated within the existing outline, and the electrical, plumbing, HVAC and insulation are replaced rather than patched. Permits and inspections are unavoidable. This is where a dated house gains modern room sizes, real ventilation and a panel that can carry today’s loads.

Structural remodel or addition

The footprint or the roof line changes: load-bearing walls removed, a wall pushed out, a garage converted, sometimes a second storey. Engineered drawings, foundation work and a full mechanical redesign come with it. This is the tier most likely to cross the 50% floodplain threshold, so that question gets settled before drawings, not after.

Budget

What whole-home renovation costs in the Houston area

Most national cost pages answering this question are aggregators extrapolating averages across the country. Here is how a contractor actually builds the number for your project.

Needs from MS Home Remodeling — Real price rangesReplace with MS Home Remodeling’s own historical bid data by tier, stating what each tier includes and excludes. No invented figures may publish here.

What moves the price

Driver Why it matters Impact
Depth of scope — surfaces or down to the studs A refresh touches finishes only. A gut adds demolition, disposal, rough-in labour for three trades, inspections and drywall across the whole house. The same square footage can differ several-fold on this one decision alone. High
Moving walls and load paths Removing a bearing wall pulls in engineering, a beam, temporary shoring and often a footing under the new point load. It also relocates whatever the wall was carrying — ducts, a plumbing stack, a panel feed. High
Full mechanical replacement A rewire, a repipe and an HVAC redesign are three separate scopes running through every room. Older houses frequently need all three at once, and doing them piecemeal later means reopening finished walls. High
How many kitchens and bathrooms are in the plan Wet rooms carry the cabinetry, tile, waterproofing, ventilation and fixture counts. Two baths instead of one is not a small increment; it is another full trade rotation through another room. High
Floodplain status and the 50% rule If the address is in a mapped floodplain and the improvement reaches half the structure’s pre-improvement value, the whole structure must be brought into compliance. That can add elevation work, or push the design toward phasing. Variable
Hidden conditions in older stock Cast-iron drains under the slab, ungrounded or aluminium branch circuits, asbestos-containing tile and mastic, lead paint, rot at wet walls and out-of-level floors. None of it is visible at the walkthrough, and all of it is real work. Variable
Finish level and long-lead selections Cabinetry construction, tile format, window packages and appliance tier move the number more than square footage does. Long-lead items also set the calendar, and a schedule stretched around a late delivery costs money too. Medium
Living on site during the work An occupied house means daily protection, dust walls, clean-up and working around belongings, plus temporary kitchens and bathrooms. It buys you rent savings and costs you productive hours and schedule. Medium

Ask any contractor for a written scope separating allowances from fixed pricing. An allowance is a placeholder for a selection you have not made yet — a bid built mostly from allowances is not really a fixed price.

Local conditions

What is different about this work in Houston

Whole-home work trips the 50% rule most often

In a mapped floodplain, the cost of an improvement is measured against the structure’s market value before the work — the building only, land excluded. At 50% or more, the entire structure must be brought into floodplain compliance, which can mean elevating it. Because a whole-home scope puts the whole house on the invoice, it crosses that line far more often than single-room jobs. Harris County Sec. 2.45 and the equivalent city ordinance govern it; only the floodplain office issues a binding determination.

Clay soils set the order of work

Beaumont and Lissie clays swell through the wet season and shrink through the dry one. That is why doors stick in one month and swing free the next, and why old drywall cracks reopen on the same lines every year. A whole-home job lets you handle it in the correct sequence: measure floor levels, resolve movement and do any foundation work, then floors, drywall and trim. Finish first and the cracks come back through your new paint.

Approvals come in layers, not one counter

There is no conventional zoning here. What governs your project is a stack: the permit office for the jurisdiction the property actually sits in — some areas are unincorporated, one community is a township — plus private deed restrictions and, in many subdivisions, HOA architectural review under Texas Property Code Ch. 209. In coastal catastrophe-area counties, windstorm (WPI-8) certification applies to qualifying window, door and roof work. Verify per address before anything is drawn.

Humidity is a design input, not a nuisance

A gutted house is the only moment you can right-size the HVAC to the new plan, redesign and seal ducts, bring them inside conditioned space, air-seal the envelope and add proper exhaust. Equipment sized by the old tonnage tends to be oversized: it cools quickly, short-cycles and leaves the house clammy. That shows up later as musty closets, cupped flooring and mould behind furniture, long after the paint is dry.

How it goes

Our process

  1. 1. Walkthrough and feasibility

    Every room measured, panel capacity and wiring type noted, plumbing material and HVAC age recorded, floor levels checked for movement. Off site, the address is run for floodplain mapping, permit jurisdiction, deed restrictions and any HOA architectural committee — before a number is discussed.

  2. 2. Scope, drawings and trade sequence

    A written room-by-room scope, drawings for anything structural, and the order the trades will run. The two big decisions get made here: all at once or in phases, and stay in the house or move out. Even a phased job is drawn for the finished house.

  3. 3. Selections locked before demolition

    Windows, cabinetry, tile, plumbing fixtures and appliances chosen, priced and ordered up front. Long-lead items dictate the schedule far more than crew size does, and a selection made after rough-in is a change order, not a choice.

  4. 4. Permits and approvals

    Application to the jurisdiction that actually covers the property, HOA architectural submission where one exists, a floodplain determination where the parcel is mapped, and windstorm requirements where the county calls for them. Approval timelines are built into the schedule rather than assumed away.

  5. 5. Demolition, structure and rough-in

    Strip out, then structural work and floor levelling, then plumbing, electrical and HVAC rough-in, then inspection, insulation and drywall. That order is not negotiable — every trade after the first depends on the one before it being signed off and still open to view.

  6. 6. Finishes, commissioning and punch list

    Flooring, cabinetry, trim, tile, paint and fixtures, in sequence. HVAC is commissioned and airflow checked room by room rather than assumed. Then a written punch list walked with you, corrections closed out, final inspection, and handover of manuals, warranties and the as-built notes.

Decisions

Options and decisions

All at once, or in phases

All at once is cheaper per square foot and faster: one mobilisation, one trade sequence, one round of inspections. Phasing repeats that overhead and sometimes reopens finished work for a pipe or duct. Phase when the budget genuinely is not available, when you cannot vacate, or when an approval is unresolved — but draw the whole house first.

Stay in the house, or move out

A room-by-room cosmetic refresh is liveable if a kitchen and one bathroom stay working. A gut is not: water, power and air conditioning go down in stretches, and an opened, unconditioned house holds humidity that your new materials will not enjoy. Staying also slows the crew. Decide once you have seen the trade sequence.

How far to open the plan

Houses from the 1960s to the 1980s are compartmentalised, and those interior walls often carry load, a plumbing stack or the only duct run to the back of the house. Opening up buys light and sight lines; it also buys a beam, an HVAC rebalance, louder rooms and more volume to cool.

Replace the mechanicals, or keep what works

Judge each system on its own age and condition rather than as one vote. Panel and branch wiring, supply and drain lines, and the HVAC all have different clocks. The rule of thumb that matters: anything you would regret opening a finished wall for later should be replaced while the wall is already open.

Selections

What holds up on the Gulf Coast

Element What we recommend Why
Flooring across the whole floor plate Porcelain tile or rigid-core vinyl plank over slab, run as one continuous material through the main living areas Slab moisture and swinging humidity punish solid hardwood, and a single continuous run hides the small level differences that clay movement leaves behind at doorways.
Cabinet boxes Plywood or a genuinely moisture-resistant substrate, not raw particleboard In a humid climate, and after any water event, particleboard swells and never recovers. Plywood boxes can dry out and stay square, which matters when a whole kitchen and every bathroom are being replaced at once.
HVAC equipment and ductwork Right-sized staged or variable-speed equipment, sized on the new plan; ducts sealed and kept inside conditioned space where the framing allows Dehumidification matters more here than raw tonnage. Oversized single-stage units satisfy the thermostat before they pull moisture out, and ducts in a hot attic sweat and lose capacity.
Insulation and air-sealing Air-seal the envelope first, then insulate; no interior polyethylene vapour barrier This is a cooling-dominated climate, so vapour drives inward for much of the year. A sealed inside face traps that moisture inside the wall assembly instead of letting it dry.
Interior doors and trim Solid-core doors; keep MDF trim and cabinetry out of bathrooms, utility rooms and anywhere near the slab edge Hollow doors telegraph seasonal movement and warp, and MDF wicks water at its cut ends and swells permanently once it does.
Windows Low-E glazing throughout, and impact- or pressure-rated units where windstorm certification applies Solar heat gain is the largest single load on the new HVAC design. In coastal catastrophe-area counties the rating is a condition of certification on qualifying work, not a preference.
Paint and wet-room finishes Mildew-resistant paint, satin or semi-gloss in bathrooms and laundry, and exhaust fans ducted to the outside Fans that discharge into the attic move the moisture problem rather than solving it, and flat paint in a humid bathroom gives mould a surface it can hold on to.
Proof

Needs from MS Home Remodeling — Project photography6–9 real project photos, ideally before/after pairs, each captioned with neighbourhood, scope and duration, plus written client permission. Do not substitute stock imagery.
Needs from MS Home Remodeling — Customer reviews3–5 verbatim reviews with reviewer first name and city, and a link to the live Google Business Profile. Reconcile the conflicting review figures first.
Questions

Whole-Home Renovation questions

Should we renovate all at once or in phases?

All at once is usually cheaper per square foot and always faster overall. The crew mobilises once, the trades run in a single sequence, and you pay for one set of dust walls, one disposal cycle and one round of inspections. Phasing costs more in total because every phase repeats that overhead, and because a wall finished in phase one often gets reopened in phase three for a pipe or a duct. Phasing is the right answer when the budget genuinely is not available at once, when you cannot vacate, or when an approval question needs settling before the larger work starts. If you phase, still draw the finished house first so nothing gets built twice.

Can we live in the house during the work?

You can if the work is a cosmetic refresh done room by room and a kitchen and one bathroom stay usable. Once the job goes to studs and the mechanicals come out, the house loses water, power or air conditioning for stretches, and moving out is the honest answer. In this climate that is more than a comfort issue: an opened, unconditioned house holds humidity, and new drywall, cabinetry and flooring do not tolerate it well. Living on site also slows the schedule, because crews lose hours each day to protection, clean-up and working around your belongings. Price the rental either way, then decide once you have seen the trade sequence — that is where the unliveable weeks appear.

How long does a whole-home renovation take?

Longer than most people plan for, and the construction weeks are usually not the constraint. Three things set the calendar: how long design and selections take, how long approvals take in your jurisdiction, and lead times on windows, cabinetry and appliances. Any one of them can outrun the build. Inspections then add fixed pauses between rough-in and cover-up that no amount of extra labour shortens. The honest way to get a date is to sequence your actual job on paper — trade by trade, with inspection holds and confirmed lead times — rather than quote an average. Ask to see that schedule before you sign, and ask what happens to it if a hidden condition turns up.

What is the 50% rule, and will our project trigger it?

It applies to structures in a mapped floodplain. If the cost of your improvement reaches 50% or more of the structure’s market value before the work — the building alone, land excluded — the whole structure must be brought into floodplain compliance, which can mean elevating it. Whole-home renovations trip this more often than any other kind of job, simply because the whole house is in the scope. Harris County Sec. 2.45 and the equivalent city floodplain ordinance set out the requirement, but the only answer that counts is a written determination from the floodplain office for your address and your numbers. Get it early, because it can change the design, the budget and whether you build in stages.

Who issues the permit, and does the HOA get a say?

Start by establishing who actually has jurisdiction, because the mailing address does not answer that. Parts of this region are unincorporated and reviewed at county level, at least one community is a township rather than a city, and some subdivisions answer to an architectural committee more than to any permit counter. Structural work, mechanical replacement and anything that changes the footprint will need permits and inspections almost everywhere. Separately, private deed restrictions and HOA review under Texas Property Code Ch. 209 can control elevations, materials and colours regardless of what a permit would allow. In coastal catastrophe-area counties, windstorm (WPI-8) certification applies to qualifying window, door and roof work. All of it is verified per address.

Are remodelling contractors licensed in Texas?

Texas does not license general contractors or remodellers. The Texas Residential Construction Commission was abolished on 1 September 2009 and was never replaced, so anyone claiming a state remodelling licence is describing something that does not exist. What is licensed is the trades: electricians, plumbers and HVAC technicians are licensed by the Texas Department of Licensing and Regulation, and that work must be performed by a licence holder. So the useful questions are different ones. Who holds the trade licences on your job, what insurance is carried, what the written scope actually covers, and how change orders are priced and approved. Ask for the trade licence numbers and verify them yourself — it takes a few minutes online.

What tends to be hiding in a 1960s to 1980s house here?

There is a predictable list. Cast-iron drain lines under the slab are at or near the end of their service life, and the time to replace them is while the floors are already open. Galvanised supply lines narrow with scale and drop pressure. Panels are undersized for modern loads and some circuits are ungrounded; aluminium branch wiring appears in houses wired around the late 1960s and early 1970s and needs correct terminations rather than removal. Floor tile, mastic and textured ceilings from before the mid-1980s can contain asbestos, and paint in housing built before 1978 falls under the federal lead RRP rule. Both call for testing and a defined process, not an assumption either way.

What happens if we change our minds partway through?

Late changes are the biggest single cause of budget drift on whole-home jobs, and the reason is sequence. Trades run in a fixed order: structure, then plumbing, electrical and HVAC rough-in, then inspection, insulation and drywall, then finishes. A change requested before rough-in usually costs only the price difference. The same change after drywall costs demolition, a second rough-in, a second inspection and a second finish, on work you have already paid for once. That is why selections are locked before demolition starts. If something does have to change, ask for it in writing with the cost and the schedule effect stated before anyone lifts a tool — and expect a genuine hidden condition to be handled the same way.

Service areas

Where we work

We serve the Houston metro from Katy and Cypress east to Kemah and League City,
north to Conroe and The Woodlands, and south through Pearland, Alvin and Texas City.

Talk to someone who has done this before

Tell us about your whole-home renovation project and we will walk you through scope,
budget and timeline — no obligation, no pressure.

Need a fast quote? - Houston
Call, message, or request your free estimate now.
Fast quote today • Same-day response available
Call Now: 12812356971 Chat on WhatsApp Book Appointment
Free Estimate Request
Thank you. EVOTECH received your request.
Fast quote • Call, WhatsApp, or send your request now
Call Book
Free Estimate Available
Send your details now and MSREMODELING will contact you quickly with pricing.
Thank you. EVOTECH received your request.