A kitchen demo in a 1968 Sharpstown ranch and a kitchen demo in a 2006 Cinco Ranch two-story use the same words and turn into two different jobs. In the older house the cabinets come off and the wall starts talking: galvanised…
- Licensed & Insured
- 20+ years remodeling
- 17 cities served
- 102 ZIP codes covered
In short
Demolition runs the same order regardless of vintage. Power and water are isolated and proved dead at the panel and at the fixture, gas is capped by the appropriate trade, appliances come out first. Countertops are cut free and removed before the boxes, since a stone slab lifted off a cabinet run…
What the work involves
Demolition runs the same order regardless of vintage. Power and water are isolated and proved dead at the panel and at the fixture, gas is capped by the appropriate trade, appliances come out first. Countertops are cut free and removed before the boxes, since a stone slab lifted off a cabinet run is safer than one levered off. Uppers come down before lowers so nobody works under a loaded box. Then flooring, backsplash, and whatever drywall has to open for rough-in. In older stock the demo usually keeps going to the studs on any plumbing wall, so the drain, the branch supply and the wiring can be inspected instead of assumed. In newer construction we tend to open selectively, cutting only where a fixture or circuit moves. Rebuild reverses it: rough plumbing and electrical, inspection where the work is permitted, insulation and drywall, slab prep and flooring, cabinets set to a laser line and shimmed, countertop template, then splash, trim, hood duct, and final trim-out of devices and fixtures.
What gets specified, and why
Repipe decisions get made during demo, not after. Galvanised branches that show restriction are replaced in PEX or copper rather than reconnected, and old cast iron gets a proper shielded transition coupling to the new material, not a rubber sleeve buried in the floor. Aluminium branch circuits get addressed with listed connectors or replaced back to the panel by the electrician; nothing about a new kitchen makes old aluminium terminations safe. Cabinet boxes in this climate should be plywood, not particleboard, and the sink base especially, because a slow supply leak turns a particleboard deck into oatmeal that never dries out. Backing for tile goes on cement board or a decoupling membrane rather than straight over old subfloor patches, and tile over slab gets a movement joint at the perimeter and at any existing control joint. Countertop choice is mostly aesthetic, but quartz stays put better than a natural stone with open veining under hard-water spotting, and any stone gets sealed on schedule. Insulation on exterior walls in flood-exposed areas is worth specifying as closed-cell.
Why the Gulf Coast changes this job
The slab is the dividing line. Older inner-loop kitchens sit on thin conventionally reinforced slabs poured over expansive Beaumont clay, and decades of wet-dry cycling leave them out of plane by enough that a new cabinet run will not sit flat without grinding or self-levelling underlayment. Post-1985 stock in Katy, Cypress and Fulshear is commonly post-tension, so any anchoring, plumbing relocation or saw-cut has to be preceded by scanning and by the tendon layout, not by a guess. Cast iron drains from the same era are usually scaled and sometimes channelled at the invert, and once the floor is open it is worth camera work before a new floor goes down over them. Humidity matters in both: an opened wall cavity in July collects moisture fast, so exposed framing gets checked and dried before insulation and board go back, and hood and dishwasher venting get sized and routed properly rather than dumped into a soffit.
Where these jobs go wrong
The expensive one is cutting into a post-tension slab without scanning. A severed tendon is a structural repair, not a plumbing repair, and it happens most often on island drain relocations. Second is capping or transitioning cast iron badly, so a joint that is fine on day one weeps under a new floor for a year before anyone notices the grout darkening. Third is removing a wall on the assumption it is non-bearing because the ceiling looks flat; in 1960s and 70s ranches the run of ceiling joists is often perpendicular to what people expect, and the header has to be sized before the wall is opened, not after. Fourth is setting cabinets on an unlevelled slab and chasing the error into the countertop, so the dishwasher will not sit square and the drawer fronts show a wedge of shadow. Fifth is venting a range hood into the attic or into a dead soffit, which in this humidity puts grease-laden moist air into a space that never dries. Sixth is reusing old two-wire, ungrounded receptacle circuits behind new counters.
What moves the price
What moves the number is not the finishes people expect. Plumbing relocation is first: moving a sink or adding an island drain means opening slab, and in post-tension construction it means scanning plus a repair detail. Electrical scope is second, because an older panel with no spare capacity, no dedicated circuits and aluminium branch wiring pushes work back to the panel. Structural change is third: any wall coming out needs a header, and a header sometimes needs a point-load path down to the slab. After that comes the state of what is under the cabinets, since slab flatness correction, damaged subfloor, or a drain line that fails a camera check all add work that was not visible at bid. Cabinet construction level, whether existing boxes can stay, hood ducting length, and permit scope round it out. Ranges vary widely and no honest figure exists before the walls are open.
How a project runs
It starts with a walk-through where we look at the panel, the drain cleanout, the age of the supply lines and the plane of the floor, not just the layout. Demo is scheduled with containment, isolation, and dust control in place. Anything discovered behind the wall gets photographed and priced as its own decision before it becomes part of the job, so there is no vague allowance absorbing surprises. Permitted trades pull their own permits where the jurisdiction requires it, and requirements differ between the City of Houston and unincorporated Harris or Fort Bend County. Cabinet and countertop lead times set the schedule more than labour does. Call MS Home Remodeling at (281) 235-6971 to walk the kitchen before anything comes off the wall.
Common questions
How do I know whether my slab is post-tension?
Look for small circular patches roughly two inches across around the perimeter of the slab edge, and check whether the original builder placed a warning plate in the garage. Neither is conclusive. Before any saw cutting we have the slab scanned, because the consequence of guessing wrong on an island drain relocation is a structural repair rather than a plumbing one.
Does an older kitchen always need a full repipe?
No. What matters is what the open wall shows. Galvanised supply that has scaled down internally gets replaced because pressure and flow will not recover, but copper in good condition can stay. Cast iron drains are judged by camera, not age. The decision is made after demo with the line in front of us, not at bid.
Can I keep my existing cabinets and only redo the rest?
Sometimes. Plywood boxes that are square, dry and solidly attached can take new doors, drawers and hardware. Particleboard boxes with swollen bottoms, racked frames or blown-out hinge screws are not worth finishing. The sink base is the honest test, because it takes the most water and shows failure first in this humidity.
Is a permit required for a kitchen remodel in Houston?
Houston has no zoning but does permit plumbing, electrical and structural work, and cosmetic-only work is treated differently from work that moves a drain or alters framing. Unincorporated Harris and Fort Bend County follow their own processes. We confirm what applies for your address rather than assuming, and the permitted trades handle their portion.
Kitchen Demo And Rebuild by location
We cover 102 ZIP codes across the Houston metro. Pick the area closest to you:
- Bellaire 77401
- Brookshire 77423
- Cypress 77429
- Cypress 77433
- Fresno 77545
- Fulshear 77441
- Houston 77002
- Houston 77003
- Houston 77004
- Houston 77005
- Houston 77006
- Houston 77007
- Houston 77008
- Houston 77009
- Houston 77010
- Houston 77011
- Houston 77014
- Houston 77016
- Houston 77018
- Houston 77019
- Houston 77020
- Houston 77021
- Houston 77022
- Houston 77023
- Houston 77024
- Houston 77025
- Houston 77026
- Houston 77027
- Houston 77028
- Houston 77030
- Houston 77031
- Houston 77033
- Houston 77035
- Houston 77036
- Houston 77037
- Houston 77038
- Houston 77039
- Houston 77040
- Houston 77041
- Houston 77042
- Houston 77043
- Houston 77045
- Houston 77046
- Houston 77047
- Houston 77048
- Houston 77051
- Houston 77053
- Houston 77054
- Houston 77055
- Houston 77056
- Houston 77057
- Houston 77060
- Houston 77063
- Houston 77064
- Houston 77065
- Houston 77066
- Houston 77067
- Houston 77068
- Houston 77069
- Houston 77070
- Houston 77071
- Houston 77072
- Houston 77074
- Houston 77076
- Houston 77077
- Houston 77079
- Houston 77080
- Houston 77081
- Houston 77082
- Houston 77083
- Houston 77084
- Houston 77085
- Houston 77086
- Houston 77087
- Houston 77088
- Houston 77090
- Houston 77091
- Houston 77092
- Houston 77093
- Houston 77094
- Houston 77095
- Houston 77096
- Houston 77098
- Houston 77099
- Houston 77204
- Katy 77449
- Katy 77450
- Katy 77493
- Katy 77494
- Missouri City 77459
- Missouri City 77489
- Orchard 77464
- Richmond 77406
- Richmond 77469
- Rosenberg 77471
- Simonton 77476
- Spring 77379
- Stafford 77477
- Sugar Land 77478
- Sugar Land 77479
- Thompsons 77481
- Tomball 77377
Planning kitchen demo and rebuild?
We measure, look at the slab and the existing rough-in, and give you a scope you can actually compare against another bid.
MS Home Remodeling · 1530 W Sam Houston Pkwy N, Houston, TX 77043 · (281) 235-6971